2022 BMW M4 Competition xDrive

Speed Sensitive Rain Detecting Variable Intermittent Wipers

History & Pricing Tools

AutoCheck score dial
97
92
97

This vehicle's AutoCheck Score: 97

Similar vehicles usually range between 92-97.

The AutoCheck Score is based on a vehicle's history such as vehicle class and age, number of owners, accident and damage history, title brands, odometer readings etc. This score is used to compare vehicle's favorability against the entire market of vehicles with the same scoring system.

Number of owners image Number of owners image
Calculated Owners: 2
  • AutoCheck iconTitle - Clean
  • AutoCheck iconAccident / Damage - No Issue
  • AutoCheck iconInsurance Loss / Transfer - No Issue
  • AutoCheck iconOdometer - No Issue Last Odometer Reading: 26,190
  • AutoCheck iconRecalls - No Open Recalls

Features

Exterior
Blue
Interior
Orange
Drivetrain
All Wheel Drive
Engine
3.0L 6 Cylinders
Horsepower
503 hp @ 6250 rpm
Torque
479 lb-ft @ 2750 rpm
Transmission
Automatic
Style
Competition xDrive Coupe

Top Features

Air Conditioning: Multi-Zone A/C
Audio: Smart Device Integration
Convenience: Back-Up Camera
Convenience: Cruise Control
Convenience: Hands-Free Liftgate
Convenience: LED Headlights
Convenience: Navigation System
Convenience: Universal Garage Door Opener
Drivetrain: All Wheel Drive
Engine: 3.0L 6-Cylinder TwinPower Turbo
Engine
3.0 L/183
Twin Turbo Premium Unleaded I-6
Exterior
Fixed Rear Window w/Defroster
LED Brakelights
Speed Sensitive Rain Detecting Variable Intermittent Wipers

Description

M4 COMPETITION..........3.0L TWIN-TURBO INLINE-6 ENGINE.... AWD.... ORANGE LEATHER SEATS.... BLUETOOTH.... REVERSE CAM.... CLIMATE CONTROL A/C.... DUAL POWER SEATS.... MEMORY SEATS.... HEATED FRONT SEATS.... POWER WINDOWS/LOCKS/MIRRORS.... LEATHER TILT/TELE STEERING WHEEL.... PARK ASSIST.... SPORT PACKAGE.... KEYLESS ENTRY.... 19" FRONT/20" REAR M FORGED ALLOY WHEELS....................***Not All Used Cars or Used Car Companies are Created Equal. 
***2026 DealerRater NATIONAL Used Dealer of the Year
***Over 10,460 positive reviews and counting
***Shop in our 80K sq ft Indoor Showroom
***Over 500 Vehicles Monthly
***CALL NOW

For immediate answers to your questions please call Chris Mikell, direct at 214-412-1611, anytime. 

"Where do our cars come from?" Dallas Lease Returns gets access to over 600 unique Lease Returns and trades a month. Primarily these cars are one-owner, local, lease returns. All vehicles are checked for current and previous damage history using Carfax and then Certified by Carfax. Generally, only the top 65% make it to the website. 

Kris Gaerlan, Dallas Lease Returns- "We exist because people want honest answers, a great environment to see cars, and most importantly great people to work with….”

***All Sales are subject to all local taxes and fees, including a $225 doc fee, and a Dealer Prep of $487. 

Specifications

Tire - Front: Tires - Front Performance
Tire - Rear: Tires - Rear Performance
Exterior
Black Grille
Black Power Heated Side Mirrors w/Driver Auto Dimming, Power Folding and Turn Signal Indicator
Black Side Windows Trim and Black Front Windshield Trim
Body-Colored Door Handles
Body-Colored Front Bumper
Body-Colored Rear Bumper w/Black Rub Strip/Fascia Accent
Fixed Rear Window w/Defroster
Front License Plate Bracket
Galvanized Steel/Aluminum/Composite Panels
Headlights-Automatic Highbeams
LED Brakelights
Light Tinted Glass
Lip Spoiler
Perimeter/Approach Lights
Rocker Panel Extensions
Speed Sensitive Rain Detecting Variable Intermittent Wipers
Tire Mobility Kit
275/35R19 Fr & 285/30R20 Rr Performance -inc: Non run-flat
Trunk Rear Cargo Access

Disclaimer

All sales include a $225 doc fee and a $487 dealer prep cost. All pricing and details are believed to be accurate, but we do not warrant or guarantee such accuracy. The prices shown above, may vary from region to region, as will incentives, and are subject to change. Vehicle information is based off standard equipment and may vary from vehicle to vehicle. Some vehicles may not qualify for the 3mo 3k mile limited powertrain warranty. Call or email for complete vehicle specific information.  * Estimated Monthly Payment is based on 5.49% at 72 Mo with 15% down and doesn't include TT&L
Interested? Tap here for contact options.

Shopping Tools

Schedule a Test Drive

Please fill out the fields below
Verification Required

Text Link to Phone

Please fill out the fields below
Verification Required

Manager's Special

Please fill out the fields below
Verification Required
Your Request has been submitted successfully
Our team will contact you soon.
Unable to submit form

Ask a Question

Please fill out the fields below
Verification Required
Accessibility Widget Spinner: White decorative
Hide white left arrow Unhide